Build log

Retractable gear working

I spent this weekend getting my retractable gear working.  Last weekend I picked up some 5606 aviation hydraulic fluid, so I filled the tank and gave it a whirl.  I should have checked all the hydraulic fittings first, as after a few actuations, the red fluid started dripping out the bottom of the keel.  I […]

Package shelf continued and rear seats

This package shelf is turning out to be a lot more work than I thought.  I’m turning the corner on it now.  I micro’ed in aluminum angle brackets onto the fuselage sides to hold the upright shelf portion in place.  I finished the base by adding aluminum brackets to support the upright portion.  I will […]

More work on the package shelf

This week I’ve been working on getting all the fiberglass work finished on the package shelf.  This turned out to be a lot more work than I thought it would be.  It also consumed a lot more BID and epoxy that I thought!  After having fabricated the essential structure, I wanted to add hinged access […]

Seat belt hardpoints

Put the seat belt hardpoints in yesterday.  I bought inertial retractable belts for the front and simple lap belts for the rear.  Hardpoints were mounted as per the build manual: Micro-slurry under/around and 2 layers of BID on top.

Working on the rear package shelf

After consulting with a few Velocity builders on the different ways to close off the firewall and create a package shelf, I got started.  This is my first fiberglass work on the plane.  Good place to start as I am just building interior panels and nothing structural.  I first cut 1/2″ foam to fit in […]